Basic Substation Soil Remediation: Project consisted of Remediation of TPH contaminated soil. Additional contaminants include asbestos, VOC’s, SVOC’s, PCB, PAH’s levels of which did not exceed trace concentrations.
Demo-Debris Hauling Ernie Cragin Apts: Logistics support in the demolition of 252 apartment complex. Transportation and disposal of 42,575 tons of demolition debris and concrete foundations.
Demo-Debris Hauling Paradise Apts: Logistics support in the demolition of 265 apartment complex. Transportation and disposal of 62,021 tons of demolition debris and concrete foundations.
Nellis AFB BPA Project data Sheet: Production and Supply of #67, and #89 Rock, Washed Concrete Sand, Crusher Fines and TypeII/V CalPortland Cement. . Mobilize personnel and trucks as required in support of the 820th RED HORSE Squadron training and large scale home station projects.
VA Hospital PDS: Site preparation and installation of all irrigation, soils, rock mulches, plants, and exterior site furnishings for this newly built state-of-the-art 90 bed Veteran’s Administration Hospital.
Event Center – Restroom Reno: The restroom renovation area, 1750 GSF, required plumbing for 2500 person occupancy of the event center; 1250 female, and 1250 male.
Facilities Improvement Project – Monterey Tower: The physical size of the project covered levels 1 through 3 of the Monterey Tower at the Edgewater Casino in Laughlin NV.
Wynn Parking Structure Demolition Debris Disposal: Logistics support in the demolition of 5 story concrete parking structure. Transportation and disposal of 60,075 tons of demolition and concrete debris.
Copyright © 2011 Impact Sand & Gravel • 145 E Warm Springs • Las Vegas, NV 89119 • 702.597.1010 tel • 702.939.9055 fax •